
(Including agricultural buildings)
£330 per 0.1 hectare (or part thereof) of the site area up to a maximum of £250,000
Alterations or extensions to existing dwellings and operations within curtilage - £166
Erection of Dwellings
£330 per dwelling up to a maximum of - £125,000
Erection of buildings
(other than dwellings or plant and machinery)
£166 - up to 40 sq.m. of new floor space
£330 - 40 sq.m. to 75 sq.m. of new floor space
£330 - each additional 75 sq.m. (or part thereof) of new floor space up to a maximum of £250,000
Agricultural buildings
£61 - up to 465 sq.m. floor space
£330 - 456 sq.m. to 540 sq.m.
£330 - each additional 75 sq.m. to a maximum of £250,000
Greenhouses and Polythene Tunnels
£61 - up to 465 sq.m.
over 456 sq.m. - £330 for each additional 75 sq.m. or part thereof.
Erection, Alteration or Replacement of Plant or Machinery
£330 per 0.1 hectare (or part thereof) of site area up to a maximum of £250,000
Siting, Access and Landscaping only - £330
The Mining and Working of Minerals, Waste Disposal, Minerals/Material Storage
£166 per 0.1 hectare (or part thereof) of site area
Car Parks, Service Roads or Other Accesses for Existing Uses - £166
Playing Fields (for sports clubs or other non profit making recreational bodies) - £330
Other Engineering or Other Operations on Land
£166 per 0.1 hectare (or part thereof)
Change of Use
(including change of use into 2 or more dwellings)
£330 per extra dwelling created up to a maximum of £250,000
The Making of Material Change of Use of a Building or Land - £330
Retention of Use of Buildings Without Complying with Conditions Attached to Previous Permission - £166
On Land Relating to Business or an Advance Sign in a Location from which the Property Cannot be Seen - £90
Other Advertisements - £330
See Fee for Equivalent Planning Application
1. Applications for listed building consent.
2. Applications for extensions and alterations to a disabled person's dwellinghouse to improve access, safety,comfort etc., or to provide access for disabled persons to a building to which the public have access.
3. Applications required by reason of an article 4 directon.
Applications required because of the removal of permitted development rights by a condition attached to a planning permission.
4. Applications for one revision to a development of the same character or description within 12 months of decision or in the case of withdrawal of an earlier application within 12 months of date registered.
5. Application for consent required by any condition attached to a full permission.
6. Application for change of use within the same class.
Application by a Community Council - 50% of listed fee.
